SolarDisclosureIndependent Solar ReportsSign inCheck my system

Installed by ADT Solar, Sunpro Solar or Sun Pro Solar?

This sample is built from real research on ADT. Enter your address and we will build the same document for your system, your equipment and your state.

Build my kit →
THIS IS A SAMPLE. The homeowner, the address and the equipment below are examples. Everything about ADT Solar and Sunpro Solar is real research, dated, and sourced. The blurred parts are the parts you are buying.
Solar Warranty Rescue Kit

Your solar warranties after ADT Solar closed

What survived, who honors it now, and exactly how to claim it.
Prepared forJane Sample
Prepared on8/18/2026
Property100 Example Street, Springfield
Installed3/4/2021
Contract nameSunpro Solar
System7.2 kW, 18 panels

1. Sunpro Solar and ADT Solar are the same company

If the name on your contract is Sunpro Solar, this kit is still yours. ADT completed its acquisition of Sunpro Solar on 12/9/2021 and introduced the ADT Solar brand at that point. Same business, same installation crews, same warranty obligations — a new name on the door.
If your paperwork saysYou were installedWho owes the workmanship warranty now
Sunpro Solar
or Sunpro Solar Energy Specialists,
or Sun Pro Solar — all the same company
Before 12/9/2021 ADT Inc.
It acquired the obligation with the company
ADT Solar
or ADT Solar LLC
12/9/2021 onward ADT Inc.
Same entity, same obligation
Why this matters more than it sounds. A warranty claim has to be filed against the name on your contract, and manufacturers and support desks reject claims that name the wrong entity. If you were installed in 2019 and you write to ADT Solar, you are writing about a brand that did not exist yet. Your kit tells you which name to use and why.

2. What happened to ADT Solar

ADT Solar closed. ADT Inc. did not.

ADT exited residential solar and ceased operations on 1/24/2024, having stopped accepting new customers on 2/19/2024. It had ceased substantially all solar operations by 6/30/2024.

ADT Inc. never filed for bankruptcy. It is a going concern and still trades publicly. That single fact separates you from most homeowners whose installer closed: there is a solvent company on the other end of your warranty. When ADT announced the exit it said it would follow through on its 25-year limited workmanship warranty and 25-year power production guarantee.

The catch is reachability, not solvency. The former adtsolar.com no longer resolves, and ADT publishes no solar phone line at all. A number for ADT solar support circulates online; we could not confirm it works, so this kit does not print it as a working channel. What we did confirm are three routes that were live and responding when we last checked them — they are in section 6.

3. Your coverage today

ComponentTermLeftNow honored by
Workmanship and labor
Sunpro Solar, then ADT Solar
Marketed as 25 yrs
Your signed certificate governs
19 yrs left of 25
Likely in force
ADT Inc. — solvent, and on record committing to it. Covers the installation itself: mounting, wiring, and typically roof penetrations.
Production guarantee
Sunpro Solar, then ADT Solar
Marketed as 25 yrs
19 yrs left of 25
Likely in force
Covers a shortfall between guaranteed output and what you actually produced. Impossible to claim without a production record — see section 4.
Solar panel modules
Your panel manufacturer
12-yr product
25-yr performance
6 yrs left of 12
19 yrs performance
Claimable
Unaffected. Never was your installer’s promise.
Microinverters
Your inverter manufacturer
25-yr product
19 yrs left of 25
Claimable
Replacement units shipped free on a valid claim.
Monitoring and alerts
Your monitoring platform
Platform survives
No fixed term
Action needed
The platform did not die with ADT Solar. Your account exists, but ADT likely still holds owner rights on it.
Production drops, we alert you.
5
Total warranties
0
You have lost
5
Still claimable
5
Years since install
Nothing is lost. That is unusual, and it is the direct consequence of ADT Inc. never having filed for bankruptcy. Most homeowners whose installer closed lose the workmanship warranty outright. You have not — but an unreachable warranty and a lost one feel identical until somebody hands you a working channel.

4. Is your system actually producing?

Your production guarantee is worth nothing without a record. This is the difference it makes.

Healthy System

JFMAMJJASOND
Actual output
Normal production, typically goes up with summer.

Problem System

JFMAMJJASOND
As expected Below expected Lost production
Production drops, we alert you.

5. What can go wrong, and what to do about it

1

Production and monitoring

Problem
  1. You cannot see your production data
  2. You do not know whether your system is producing at all
  3. You get an error saying you do not own any system
None of these are your fault.
Solution
  1. Take ownership of the monitoring account in your own name
  2. We request owner access on your behalf when the installer cannot
  3. We watch it from then on and tell you when something drops
2

Workmanship and the production guarantee

Problem
  1. ADT Solar is gone and adtsolar.com no longer exists
  2. There is no published phone number to call
  3. You do not know whether to write as a Sunpro or an ADT customer
The company that owes you is still solvent.
Solution
  1. Use a channel we have confirmed responds — three are in section 6
  2. File in writing and get a case number before you close the window
  3. Name the entity on your contract, then follow with certified mail

6. How to actually reach ADT

Three channels, confirmed working

ADT publishes no solar phone line, so there is no number to call first. What exists instead is a support page, a live chat staffed by agents, and a written intake form that ADT itself links as its customer support route. All three were loaded and confirmed responding on 8/17/2026.

We also hold a phone number for ADT solar support that circulates online. We could not confirm it connects to anyone, so we do not print it. A number that rings nowhere is worse than no number, because it burns the afternoon you set aside to make the call.

The ADT support article, at its canonical address. The older link format redirects here, and the page names this as its permanent location.

The live Chat with an Agent entry point, and what to say to get routed to solar rather than alarms.

The written Customer Support and Service Team intake form, which is the route ADT means when it says existing solar customers are supported by form.

The ADT Inc. corporate address for certified mail, with the department to address it to.

In your kit
The three live channels, the exact URLs, and the certified-mail address — each with the date we last confirmed it responds.

7. Your claim letter, ready to send

Jane Sample
100 Example Street
Springfield
8/18/2026
ADT Inc.
Attn: Legal Department
Re: Workmanship warranty claim — system installed 3/4/2021 by Sunpro Solar
To whom it may concern,
I am the owner of the property at 100 Example Street, Springfield. A solar array of 18 modules was installed at this property on 3/4/2021 by Sunpro Solar, which ADT Inc. acquired on 12/9/2021 and operated as ADT Solar. I am writing to ADT Inc. as the party that assumed those obligations.

I am claiming under the limited workmanship warranty marketed at twenty five years from the date of installation. On the date of this letter that term has nineteen years remaining.

I note that when ADT announced its exit from residential solar in January 2024 it stated publicly that it would follow through on its twenty five year limited workmanship warranty and its twenty five year power production guarantee. I am relying on that statement.

The fault is as follows, with the date I first observed it and the production record attached.

I ask that you confirm receipt in writing within thirty days with a claim reference number. I have also submitted this through your published support channel on the date above, reference enclosed.

In your kit
The paragraphs that do the work — including the one that quotes ADT’s own public commitment back to it. That paragraph is why this letter is not a complaint but a claim.
Yours truly,
Jane Sample
100 Example Street, Springfield
Enclosures: production record, support case reference

8. What we checked, and when

  • ADT Inc. acquisition of Sunpro Solar, completed 12/9/2021 · company announcement
  • ADT exit from residential solar, 1/24/2024 · company statement and SEC filings
  • ADT Inc. corporate record · SEC EDGAR, CIK 0001703056 · verified 8/9/2026
  • adtsolar.com · confirmed no longer resolving, 8/8/2026
  • ADT support page, live chat and written intake form · all confirmed responding 8/17/2026
  • Circulating ADT solar phone number · could not be confirmed, deliberately not printed
Research rots, so we date it. This ADT research is next scheduled for recheck on 11/9/2026. If a channel stops responding before then, the kit says so rather than printing something that no longer works.

Get this for your own system — $129

One payment. Your installer, your equipment, your state, your dates.

Build my kit →

Installed by ADT Solar, Sunpro Solar or Sun Pro Solar?

This sample is built from real research on ADT. Enter your address and we will build the same document for your system, your equipment and your state.

Build my kit →